BASIC DESIGN, DETAILED ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF MATERIAL OFF LOADING FACILITIES (MOLF) JETTY AT TANJUNG SEPATA FOR REIFNERY AND PETROCHEMICAL INTEGRATED DEVELOPMENT (RAPID) PROJECT AT PENGERANG, JOHOR, MALAYSIA

Client :
Petronas
Main Contractor :
Zelan Berhad
Location :
Pengerang, Johor
Dredging Works :
4,125,000 m2
Geofabric Works :
25,000 m2
Rock Works :
45,000 m3
Period :
March 2015 to November 2015 (9 months) - on time

Description of project

Scope : Dredging, Geofabric and Rock Works