Client :
East Coast Economic Region Development Council (ECERDC)
Location :
Kuala Terengganu, Malaysia
Silt Curtain Works :
7040 m2
Excavation Works :
360,000 m3
Dredging Works :
180,000 m3
Reinstatement of Revetment Works :
Reuse Existing Rock - 28,000 m3
.
Filter Rock - 12,000 m3
.
Armour Rock - 12,000 m3
Geofabric Works :
15,000 m2
Construction Period :
September 2014 - October 2015 (13 months)