CONSTRUCTION OF TWO BREAKWATERS AND OTHER FACILITIES AT JERUDONG PARK, BRUNEI

Client :
Amedeo Development Corporation, Brunei
Main Contractor :
Hyundai E&C Co. Ltd.
Location :
Jerudong beach, Brunie
Length of Breakwaters Construction :
6,000 m.
Revetment Works :
1,510,000 m3
Construction Period :
August 1996 - April 1998 (21 months)

Description of project

CONSTRUCTION OF 2 BREAKWATERS, STORM WATER CHANNEL, SHORE PROTECTION AND OTHER FACILITIES

The massive marina development in Brunei which involved construction of two 2500m long breakwater with depth of up to -8mCD, two 500m long storm water channel breakwater, shore protection works for a man made Island and other facilities. The project required YTC to construct breakwater with a length of more than 6000m, plus an additional 2000m of shore protection works.