CONSTRUCTION OF 2 BREAKWATERS, STORM WATER CHANNEL, SHORE PROTECTION AND OTHER FACILITIES
The massive marina development in Brunei which involved construction of two 2500m long breakwater with depth of up to -8mCD, two 500m long storm water channel breakwater, shore protection works for a man made Island and other facilities. The project required YTC to construct breakwater with a length of more than 6000m, plus an additional 2000m of shore protection works.