TUAS VIEW EXTENSION RECLAMATION – SHORE PROTECTION WORKS

Owner :
Jurong Town Corporation
Consultant :
Jurong Consultants Pte. Ltd.
Main Contractor :
Hyundai Engineering & Consr. Co. Ltd., Van Oord ACZ, Ballast Nedam Dredging Joint Venture
Period :
July 2002 to present (ONGOING)

Description of project

YTC was the Main Sub-contractor for shore protection works at the largest land reclamation project in Singapore: Jurong Island Phase 4 and Tuas View Extension. This phase involved shore protection works with a length of more than 900m and a depth that varied between -10mCD to -21mCD.